KWE major Upgrade of 1984 XJ12

27/06/2006

page 1 of 5 Next

 

A1Start
Work begins on removing engine
A2OldGas
Original LPG installation is a crude single point (though two feeders for the V12). It will be replaced with a modern highly efficient multipoint emulating type with patented CrossJet injectors.
A3EngOut
Engine is hoisted out
A5EbayWashed
Engine bay very tatty - especially wiring. Looks like a pint of brake fluid has been thrown around!
A6LHinnerbay
Common rust area inside damper housing. Just saveable with some welding.
A7EngOut2
Engine is being totally retored so will be sent off for internal machining then returned for our replacement of reconditioned and new external parts.
A8Eng3
Engine part stripped
A9Eng4
.. and a bit more
B1InWingRust1
Inner Wing rust repair preparation
B2Ebay1
Engine bay primed...
B3Ebay2
... painted...
B4Ebay3
... and lacquered